Holgate Solar Energy Project

Grand Junction, Colorado

 



Last 3 Days
Chart Layout Bar Chart Line Chart Area Chart






Real Time Energy Production Today as of
(Saturday May 19 @ 10:38 am)
solar light KWH Produced:    0 kwhs
solar aves money Cash Saved:    $ 0.00
green energy Pounds Of Carbon Emissions Prevented    0lbs
Production Since Commission Date
(Monday May 03 2010)
solar light KWH Produced:    0 kwhs
save money Cash Saved:    $0.00
green energy Pounds Of Carbon Emissions Prevented    0lbs
 
Overview
Solar Panel Layout and Design By: Sam Fortune, Project Illustrator, Syndicated Solar, Inc.

Engineered By: Josh Fabian, Installation Engineer, Syndicated Solar, Inc.

Solar Array Installation Time frame: 6 Days

Location: Grand Junction, Colorado; 39º N by 108º W; 4792' elevation

Solar Resource: 5.73 kWh/m²/day

Median Low/High Temperature: -23º/106ºF

Solar Array Capacity: 8.28 kW

Average Annual AC Production: 13,845 kWh per year


Equipment Specifications
Module Orientation: 26º Tilt at 180º Azimuth

Module Specifications: CSI-CS5A Canadian Solar, 180W STC, +/- 2.8%, 4.99 Imp, 36.1 Vmp, 5.34 Isc, 44.6 Voc

Array Racking: Solar Pro Tile Track

Array Installation: 46 Modules

System Monitoring: Enphase Enlighten

 

Residential Grid-Tied Photovoltaic System:
Holgate, Solar Powered Residence In Grand Junction Colorado

Holgate Solar Array

Solar Powered House

Solar Roof Installation

Syndicated Solar Energy Installation
 



 

 
     
  Home | Contact | About | Solar Energy Links | F.A.Q. | Our Blog | Careers | Site Map
 
 
     
     
  © Syndicated Solar,Inc.
Privacy Policy
Contact Webmaster